What a retrofit is
We fasten rigid polyiso (ISO) insulation directly to the existing metal roof, then weld a TPO membrane over it. The metal stays in place underneath, and the new membrane becomes the waterproof layer.
The process
- Inspect the metal roof, fasteners and seams
- Survey for trapped moisture and structural condition
- Clean and prep the metal surface
- Install and secure the ISO insulation
- Weld the TPO membrane and flash every edge, curb and penetration
Why retrofit instead of tear-off
Tearing off a metal roof means removing the metal, disposing of it and rebuilding the deck. A retrofit keeps the existing metal in place and puts new insulation and a new membrane on top. That usually means less disruption for occupants, less waste and a shorter schedule, as long as the metal and the structure are sound.
What the survey checks
- Moisture. Wet insulation or trapped water under the metal is the main reason a retrofit fails, so we test before we design the system.
- Metal condition. Rust, loose or backed-out fasteners, failed seams and damaged panels are repaired or noted before the membrane goes on.
- Structure. The purlins and framing must carry the added weight of insulation and membrane.
- Drainage. Slope and drains are checked, and tapered insulation is planned where water needs to be directed.
Membrane and insulation options
The ISO insulation is sized for the roof's required R-value and drainage plan. TPO, PVC and EPDM are all options for the membrane, and we'll explain the trade-offs in cost, seam strength and heat reflectivity before you choose.
When a retrofit isn't the right answer
If the metal is badly rusted, the deck is soft, or water is trapped in the system, the honest answer is a tear-off. We'll tell you that during the survey, not after the membrane is down. If you want a full re-roof of the metal instead, see our standing seam metal roofing and commercial metal roofing pages.
Frequently asked questions
Do you have to remove the metal roof?
No. The existing metal roof stays in place. The insulation and membrane go on top of it.
What goes on top of the metal?
Rigid polyiso (ISO) insulation, then a TPO membrane.
When is a retrofit not the right choice?
When the metal is badly rusted, the deck is damaged, or water is trapped under the panels. We survey first and recommend a tear-off in those cases.
How long does a metal roof retrofit last?
A retrofit membrane is typically rated for 20 years or more, depending on the product, the detailing and how the roof is maintained. The metal beneath it is not being replaced.
What should I ask a retrofit bidder?
Ask whether they survey for moisture before pricing, what insulation and membrane are included, how the flashings are detailed at the edges and penetrations, and what warranty applies in writing.