Typical timelines
- Residential, asphalt shingle: Most homes are finished in one to two days, depending on size, pitch, and how much decking needs replacing.
- Storm-damaged roofs: Many storm-damaged roofs we replace are finished in a single day.
- Commercial, low-slope: A typical commercial roof takes several days to several weeks, depending on square footage, the membrane system, and how many penetrations need work.
What can add time
- Rotted or damaged decking that has to be replaced.
- Weather. Rain or high wind stops work.
- Tear-off of multiple layers of old roofing.
- Permit or inspection scheduling, when required.
- Insurance inspection steps, if the job is part of a claim.
What we do before the crew arrives
Before work starts, we confirm the materials and walk you through the expected timeline. For insurance jobs, we document damage with photos and a written report for your adjuster.
Frequently asked questions
Can I stay in the home during the replacement?
Yes. Expect noise and crew activity on the roof during working hours.
How do I find out how long my roof will take?
Ask for a free inspection. We will give you a timeline based on your roof's size, pitch, and condition.